Material Receiving
Identify the dimensions, weight, shape and quantity of incoming long goods. Separate material categories based on their storage and handling needs.
HEDA SHELVES Warehouse Cantilever Racking Systems provide a practical storage arrangement for steel pipes, metal profiles, lumber and other suitable long or bulky goods. Product No.00303 features blue steel upright frames, orange projecting cantilever arms and structural bracing arranged in extended warehouse storage rows. The original product photographs demonstrate both open-arm storage structures and an installation carrying long cylindrical materials. By providing accessible horizontal support positions, the system can help separate different material groups and organize handling aisles. Rack dimensions, loading capacity, arm spacing and the final structural arrangement are customized according to the warehouse and stored goods.
Long-material storage efficiency depends on more than the number of rack levels. A successful warehouse arrangement should support material receiving, handling, storage and order retrieval.
Identify the dimensions, weight, shape and quantity of incoming long goods. Separate material categories based on their storage and handling needs.
Select appropriate forklifts, cranes or other approved equipment for the loads. Provide sufficient maneuvering and approach clearance.
Assign materials to suitable cantilever levels and support points. Confirm load stability, arm capacity and permissible overhang.
Keep storage positions identifiable and loading aisles accessible. Retrieval methods should suit the stored material dimensions and handling equipment.
Workflow planning reference: the final operating arrangement depends on your warehouse, inventory and handling equipment.
The first original product photograph shows a long cantilever rack positioned beside a warehouse wall. Multiple blue steel upright frames support projecting orange cantilever arms at different heights.
Cantilever storage uses projecting arms connected to vertical steel frames. The open loading face allows access to suitable long materials without front upright columns.
Vertical blue steel members provide structural support for the cantilever arms.
Horizontal steel supports provide storage positions at multiple elevations.
Diagonal members connect the rack frames as part of the stability system.
The complete rack needs suitable base supports and verified anchoring conditions.
The third original photograph shows an extensive cantilever racking installation inside a large industrial building. Blue upright columns, orange projecting arms and diagonal bracing repeat along long storage rows.
Repeated rack bays can organize a large quantity of long goods. However, the final arrangement must fit the available building space and the operating process.
The fourth original No.00303 photograph shows blue-and-orange cantilever racking with long cylindrical materials resting on selected support arms. This image provides a real storage example rather than an empty rack display.
Cylindrical materials require particular attention to loading stability and the number of supporting arms. The rack must be selected for the actual stored goods.
Long materials may require several arms to distribute their weight correctly.
Round goods may need appropriate end stops, cradles or securing arrangements.
Confirm the total weight and how it is distributed across the supporting steel arms.
The aisle must allow suitable lifting equipment to place and retrieve the long goods.
HEDA SHELVES lists the load capacity of No.00303 as customizable. Final loading must be verified for the cantilever arms, steel frames and complete installation.
Each projecting cantilever arm must support its approved share of the stored load. Arm section, projection and connection details influence the permitted loading.
The distance between adjacent support arms affects how long materials distribute their weight. Confirm the required number of supports and allowable material overhang.
The steel upright frames receive loads from the cantilever arms. Check frame capacity, cross-bracing, connections and permissible loading combinations.
Loads transfer through the structure into its bases, anchors and supporting floor. Floor capacity and installation conditions require suitable verification.
Material length, shape, weight and handling method influence how cantilever racking should be used in everyday warehouse operations.
Forklifts with suitable attachments, cranes or other approved equipment may be required for long loads. Verify equipment capacity, load stability and available working clearance before moving materials.
Keep designated loading routes clear of unrelated materials and equipment. The aisle should accommodate safe approach, lifting, turning and withdrawal for the longest stored goods.
Round pipes, bars and other cylindrical goods may require suitable restraint against rolling or shifting. Use the retention method approved for the actual material and rack configuration.
Consider suitable protection around exposed steel uprights and bases where vehicles operate. Regularly inspect the rack for damage, displaced members or other visible problems. Follow approved loading instructions.
Cantilever racking should be configured for the actual warehouse space, inventory and storage requirements. A suitable design begins with accurate project information.
Provide the minimum and maximum material lengths, widths, diameters and section shapes. These values influence arm projection and support spacing.
Specify the maximum weight of individual items or material bundles. Include the number of loads that must be stored at each level.
Determine the rack height, row length, number of support frames, arm projection and required storage elevations. All dimensions must be approved for the loading.
Plan aisle widths, access direction and handling equipment. Single-sided and double-sided arrangements may be considered where suitable, but must be separately specified and engineered.
Review the existing concrete floor, rack base positions, anchor requirements and nearby building features. Final installation must follow approved structural specifications.
HEDA SHELVES offers customizable cantilever racking for warehouses, factories and suitable industrial storage facilities. Product No.00303 uses a modular steel structure with projecting cantilever support arms. Dimensions, loading capacity and storage levels are selected according to project requirements.
Cantilever racks can accommodate compatible long and irregular goods that may be difficult to store in conventional shelving. Each material requires a suitable support arrangement and loading method.
Provide designated horizontal storage positions for suitable steel pipes, tubes and similar long materials. Confirm the required support spacing, total load weight and protection against rolling or shifting.
Organize compatible metal profiles, bars and fabricated long components across designated cantilever levels. Arm spacing, support distribution and lifting methods should suit the actual products.
Consider suitable cantilever configurations for timber boards, wooden beams and compatible building materials. Material stiffness, maximum overhang and required support points must be evaluated before loading.
HEDA SHELVES can discuss a customized warehouse cantilever racking configuration based on material dimensions, storage quantity, warehouse layout and handling requirements. Accurate details about your longest and heaviest materials will help determine suitable support arms and rack dimensions.
The final configuration requires approved arm capacities, upright loading, support spacing, stability and anchoring specifications.
Warehouse cantilever racking is a steel storage system using vertical upright frames and projecting horizontal support arms. It is suitable for consideration where long or bulky materials require accessible storage positions.
HEDA SHELVES lists the load capacity as customizable for No.00303. There is no universal numerical capacity published for every arm or complete rack configuration. Safe working loads must be verified according to the approved structural design.
Yes. Suitable pipes and cylindrical long materials are among the manufacturer's stated applications. The original product gallery also shows long round materials stored on cantilever racks. Proper support and load restraint must be provided.
Cantilever racking uses projecting support arms to accommodate suitable long or irregular materials. Conventional selective pallet racking generally uses horizontal beams to support pallets within defined rack bays. The appropriate choice depends on the stored goods and handling requirements.
Yes. The manufacturer lists product dimensions, thickness, loading capacity and number of levels as customizable. Final arm positions and rack dimensions must remain within the approved loading specification.
Cantilever systems may be configured with storage arms on one or both sides where the selected structure permits. The appropriate arrangement depends on available warehouse space, access aisles and loading requirements. The configuration must be confirmed for the project.
Cylindrical goods may require multiple supporting arms and suitable restraints against rolling or shifting. The material length, bundle weight, support positions and handling method must be reviewed together.
Suitable forklifts with appropriate attachments, cranes or other approved lifting equipment may be considered. Equipment capacity, load stability, lifting height and aisle clearances must suit the actual stored materials.
Modular cantilever configurations may allow extensions or alterations where the site and structural conditions permit. Any modification should be reviewed for component compatibility, load capacity, stability and anchoring before operation.
The manufacturer lists electrostatic spray surface treatment with anti-rust and corrosion-protection features. Special environmental requirements should be assessed according to the installation location. Outdoor use requires additional consideration.
Please provide warehouse dimensions, stored material type, maximum length, bundle weight and required storage quantity. A floor plan and details of the loading equipment will help define the appropriate cantilever layout.
Share your warehouse layout, stored material dimensions, maximum bundle weights and required storage levels. Discuss a customized warehouse cantilever racking solution with HEDA SHELVES.




Find answers to common questions about our manufacturing, product customization, ordering, delivery and warehouse shelving solutions.
We are a manufacturer. HEDA SHELVES has specialized in manufacturing warehouse racking systems, supermarket shelving and various display stands since 2001.
Our factory is located in Foshan, Guangdong, China. We warmly welcome customers to visit our factory. Please contact us to arrange your visit.
Yes, samples are available upon request. A sample charge applies, and the sample cost will be refunded when you place your next order.
Yes. HEDA SHELVES has extensive experience in customized shelving and display solutions. We can manufacture products according to customer designs and project requirements.
Of course. We welcome custom sizes and colors to meet different storage, retail display and project requirements.
Yes. Our products are mainly manufactured from metal. We also produce shelving accessories and display solutions using materials such as:
Our general production lead time is within 15 days. The actual lead time depends on the order quantity, product design and customization requirements.
Our standard payment terms are:
We can arrange shipment using the following methods:
Please provide your destination seaport. We will check and update the sea freight cost based on your shipping destination.
If you have your own shipping agent or freight forwarder, please provide their contact details. We will coordinate the delivery arrangements with your nominated agent.
Our minimum order quantity is generally 10 sets. Larger order quantities may qualify for more competitive pricing.
Since different customers and projects require different product sizes and specifications, providing the following information will help us prepare your quotation more efficiently.
Not sure about the specifications? Simply tell us about your storage or display requirements. Our experienced sales team will help you develop a suitable shelving solution.
We provide step-by-step installation drawings for each type of shelving and racking system.
Our experienced team supports customers throughout the design, production and after-sales stages.
Our shelving products are generally flat-packed and protected with bubble wrap or protective film, using standard export cartons.
Other packaging options, such as wooden boxes, are also available according to customer requirements.
The main difference is the number of upright frames required.
Example: For a continuous row of 15 wall shelving bays, the configuration would be 1 starter rack + 14 add-on racks.

