High-Quality Mezzanine Racking Systems - HEDA SHELVES
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems
  • High-Quality Mezzanine Racking Systems

High-Quality Mezzanine Racking Systems

No.00288
Our mezzanine racking systems offer a cost-effective solution for maximizing your warehouse space without the need for costly renovations or moving to a larger facility.
Download
View all downloads
  • Description

  • Specification

  • FAQ

HEDA SHELVES / MULTI-LEVEL WAREHOUSE STORAGE PRODUCT NO.00288
Custom Warehouse Mezzanine Racking

Build Up. Store More.

HEDA SHELVES High-Quality Mezzanine Racking Systems make better use of warehouse height by creating additional storage levels within an existing building. The featured rack-supported structure combines blue braced steel frames with elevated orange storage platforms, integrated shelving and designated stair access. The system can be configured for multi-level storage of cartons, spare parts and other suitable warehouse goods, reducing the need to expand the building footprint.

Rack-Supported Mezzanine 2–4 Storage Levels Custom Floor Loading
Original HEDA No.00288 multi-level rack-supported warehouse mezzanine with tall blue braced steel frames, orange elevated storage platforms and lower warehouse storage space
Original HEDA No.00288 mezzanine racking installation photograph.
300–1,000 kg/m² Published floor load range; project-dependent
2–4 Levels Multi-tier storage; customization available
2,200–2,700 mm Published space between floors
Cold-Rolled Steel Manufacturer-listed construction material
Original Product Installation

See How the Racking and Mezzanine Work Together

The original manufacturer photographs show the actual blue perforated upright frames, diagonal bracing, orange storage surfaces and integrated shelving. These details distinguish the photographed system from a basic free-standing storage platform.

Elevated Platform Access

Storage Levels Need Safe Movement Routes

A mezzanine is not just additional flooring. The design must coordinate storage positions, pedestrian circulation, stair access and edge protection.

Actual Upper-Level Detail

Platform, Railing and Storage Access

This original photograph shows orange upper-level floor surfaces, blue guardrails and blue racking structures within the mezzanine installation. The finished platform needs to accommodate both goods storage and safe personnel movement.

Platform: Engineered floor support and approved loading.
Guardrails: Protection at exposed elevated edges.
Access: Stairways and walkways coordinated with storage areas.
Handling: Defined transfer points for goods moving between levels.
Original HEDA mezzanine racking upper-level view with an orange steel platform, blue guardrails, blue structural upright frames and integrated storage racking
Original installation detail showing the upper platform and access protection.
Multi-Level Warehouse Workflow

Plan How Goods Reach Each Storage Level

HEDA lists manual handling, slides, cargo lifts and forklift-assisted transfer among potential methods for moving goods. The appropriate method depends on load weight, product dimensions, working height and site safety requirements.

01

Receive Goods

Receive, inspect and organize inventory on the ground floor before assigning it to the appropriate storage level.

02

Transfer Vertically

Use approved lifting equipment or a designated transfer arrangement where the goods cannot be carried manually.

03

Move Across the Level

Use suitable manual handling equipment or compatible trolleys, subject to the engineered platform and concentrated load limits.

04

Store and Retrieve

Allocate goods to approved storage positions while keeping walkways, exits, stairs and transfer points clear.

Equipment clarification: A forklift used to deliver a pallet to a mezzanine transfer point does not automatically mean forklifts may drive on the elevated floor. Vehicle use on the mezzanine requires specific structural, access and safety approval.
Floor Material Selection

Different Floor Surfaces for Different Storage Requirements

HEDA lists plywood, galvanized sheet and steel as possible mezzanine flooring materials. Its product page also illustrates several metal surface profiles. Floor selection must account for load capacity, slip resistance, goods handling, fire requirements and the supporting structural system.

HEDA manufacturer metal grid mezzanine flooring option with an open square steel grating pattern

Metal Grid

An open grating surface illustrated by the manufacturer. Grid openings, supporting spans, slip characteristics and approved loading must suit the intended application.

HEDA manufacturer's slotted metallic mezzanine flooring reference with parallel steel openings and supporting profiles

Slotted Metal

A steel decking profile with longitudinal openings. Suitability depends on the handling method, load distribution and any operational requirements for open flooring.

HEDA manufacturer perforated metal mezzanine floor surface reference showing a metal sheet with raised openings

Perforated Metal

A formed metallic surface with visible openings. Panel thickness, support spacing, walking characteristics and safe working load must be verified for the project.

Flooring options: These are manufacturer material reference images, not photographs of the flooring installed in every No.00288 mezzanine. The actual product photographs show orange solid floor surfaces. Other flooring materials must be selected and quoted as part of the final project design.
Upper-Level Loading Safety

Select the Right Goods Transfer Opening

A mezzanine used for pallet or carton transfer may require a controlled loading opening. HEDA illustrates different gate configurations, which should be specified based on the handling method and relevant safety standards.

HEDA manufacturer mezzanine swing gate option showing an elevated steel safety railing access section with warehouse cartons behind
Optional Access Solution / 01

Swing Loading Gate

A swing-style opening can provide controlled access for goods transfer where permitted by the approved operating procedure. Gate swing direction, locking arrangement, width and fall protection require detailed review.

HEDA manufacturer up-and-over mezzanine pallet safety gate option featuring blue steel framing and a counterbalanced transfer mechanism
Optional Access Solution / 02

Up-and-Over Pallet Gate

A suitable counterbalanced transfer gate can help maintain a protected edge during pallet loading and unloading. The gate dimensions, operating sweep and permitted pallet size must suit the handling equipment and site design.

Safety accessory clarification: These two images illustrate possible goods transfer arrangements. Their presence on the manufacturer product page does not mean both types of gate are included with every system. All elevated openings, stairs, handrails and loading zones must comply with applicable project safety requirements.
Structural and Operational Design

Five Checks Before Building a Multi-Level Warehouse

A mezzanine introduces an additional load-bearing floor inside the warehouse. Structural design, material handling and personnel safety must be planned together from the beginning.

01

Building Height and Clearances

Measure usable warehouse height, roof structure, lights, services and any overhead obstructions. Confirm required headroom on each occupied storage level.

02

Floor Load and Stored Goods

Establish intended floor loads in kg/m² together with concentrated loads from goods, shelving and handling equipment. Floor capacity must not be confused with the load rating of an individual shelf.

03

Structural Support and Floor

Confirm the steel support arrangement, load paths, bracing, base plates, floor capacity and anchoring requirements. Existing building conditions must be checked for the proposed mezzanine loads.

04

Stairways and Goods Transfer

Determine the location of stairs, loading points and any goods lifts. Pedestrian routes and goods movement should be planned to minimize operational conflicts.

05

Fire and Occupant Safety

Review guardrails, stairs, emergency exits, fire protection, sprinklers, evacuation routes and local building permits. Applicable requirements must be confirmed before construction.

Published Technical Reference

Engineering Specifications for No.00288

The manufacturer provides several standard configuration references for its mezzanine racking systems. The final mezzanine structure must be specified around floor loading, storage requirements and site constraints.

Load rating note: The manufacturer lists 300–1,000 kg/m² as its floor load range. This is a distributed floor loading reference, not a per-shelf or per-pallet capacity. The actual approved platform load, point loads and rack-supported structural capacity must be confirmed for each project.

No.00288 / Product Data

Product No. 00288
Product Name High-Quality Mezzanine Racking Systems
System Category Multi-Level Warehouse Mezzanine Racking
Main Material Cold-Rolled Steel
Floor Load Range 300–1,000 kg/m²; configuration-dependent
Storage Levels 2–4 Levels; Customization Available
Space Between Floors 2,200–2,700 mm Published Reference
Floor Materials Plywood, Galvanized Sheet or Steel, as Specified
Featured Upright Color Blue
Featured Beam Color Orange-Red
Color Customization Available Upon Request
Access Options Stairways, Ladders and Other Approved Access Arrangements
Goods Handling Manual Handling, Slides, Cargo Lifts and Forklift-Assisted Transfer as Specified
Optional Accessories Lifting Platforms, Stairs, Guardrails, Loading Gates, Shelving and Other Specified Components
Applications Multi-Level Warehouse and Industrial Storage
Dimensions Project-Specific
Engineering Approval Required for Loads, Access, Structural Stability and Installation
Warehouse Applications

Practical Multi-Level Storage for Different Inventory Types

A mezzanine system can help organize products across additional levels where the available warehouse height and structural conditions permit.

APPLICATION / 01

Spare Parts Warehouses

Organize smaller components, packaged parts and maintenance inventory across multiple rack-supported storage levels.

APPLICATION / 02

E-Commerce and Distribution

Allocate separate storage areas for suitable packaged goods, picking activities and replenishment, subject to approved loading and workflow.

APPLICATION / 03

Manufacturing Storage

Create organized space for compatible production materials, boxed components and finished goods while making better use of building height.

Custom Mezzanine Project

Plan the Mezzanine Around Your Warehouse.

HEDA SHELVES can discuss floor levels, steel racking layouts, flooring choices, stair access and goods transfer arrangements according to your project. To help prepare a suitable proposal, share the dimensions and working conditions of the existing warehouse.

Quotation priority: Please provide a warehouse floor plan, clear building height, intended storage levels and design load per square meter. Any heavy point loads, trolleys, pallet loads or mechanical handling equipment should also be identified before design approval.

Information Needed for Your Quotation

Warehouse length and width
Available clear building height
Existing floor plan
Required mezzanine area
Number of storage levels
Required clear height per level
Type of stored goods
Weight and size of goods
Required floor load in kg/m²
Concentrated or point loads
Racking and shelf layout
Preferred flooring material
Stair position and quantity
Guardrail and gate requirements
Cargo lift or transfer method
Trolley or handling equipment
Existing building services
Floor and foundation information
Local safety requirements
Delivery destination

Floor plans, photographs and project loading information help define the mezzanine structure, access arrangement and quotation scope.

Frequently Asked Questions

Questions Before Ordering a Mezzanine Racking System

What is the difference between mezzanine racking and a regular storage rack?

A regular rack provides storage locations within its frame. A mezzanine racking system creates elevated floors and additional storage levels, requiring structural support, pedestrian access and appropriate safety protection.

How many levels can No.00288 have?

HEDA lists 2–4 levels with customization available. The final number depends on building height, storage loads, supporting structure and applicable safety requirements.

Does every mezzanine support 1,000 kg/m²?

No. The published range is 300–1,000 kg/m² across different configurations. The final approved loading must be established from the floor structure and complete project design, including concentrated loads.

Can the floor material be customized?

Yes. HEDA lists plywood, galvanized sheet and steel floor materials. Different metal surface profiles are also illustrated on the manufacturer's product page. Material selection must suit loading and operational conditions.

Can a cargo lift be added to the system?

Cargo lifting equipment is among the potential handling options identified by HEDA. Lift capacity, shaft or landing dimensions, gates, electrical requirements and safety approvals need to be coordinated separately.

Are stairways and safety gates included?

The photographed installation includes an orange staircase, while the product page illustrates several possible access accessories. The exact stairs, guardrails and loading gates included must be confirmed in the quotation.

Can a mezzanine be installed in an existing warehouse?

Yes, subject to the suitability of the building, floor and foundation. Available height, structural loads, emergency access, fire protection and local permits must be reviewed before installation.

What should I provide to receive a quotation?

Provide a warehouse floor plan, clear building height, intended storage loads, desired number of levels, flooring preferences and goods handling requirements. This information helps develop a suitable project proposal.

HEDA SHELVES / MULTI-LEVEL STORAGE SOLUTIONS

Planning a Warehouse Mezzanine Racking Project?

Share your warehouse dimensions, storage loads, required levels and access requirements. Discuss a customized multi-level storage solution with HEDA SHELVES.

GET QUOTE NOW →
1. Light and medium upright

2. Heavy duty upright

3. Step beam

4. Box beam

HEDA SHELVES / CUSTOMER SUPPORT

Frequently Asked Questions

Find answers to common questions about our manufacturing, product customization, ordering, delivery and warehouse shelving solutions.

01 Are you a manufacturer or a trading company?

We are a manufacturer. HEDA SHELVES has specialized in manufacturing warehouse racking systems, supermarket shelving and various display stands since 2001.

02 Where is your factory located? Can I visit?

Our factory is located in Foshan, Guangdong, China. We warmly welcome customers to visit our factory. Please contact us to arrange your visit.

03 Are product samples available?

Yes, samples are available upon request. A sample charge applies, and the sample cost will be refunded when you place your next order.

04 Can you manufacture products according to our designs?

Yes. HEDA SHELVES has extensive experience in customized shelving and display solutions. We can manufacture products according to customer designs and project requirements.

  • Floor plans and 3D drawings can be provided by HEDA engineers.
  • Customized shelving layouts and configurations are available.
  • Our products support modular construction and integration into different store or warehouse layouts.
05 Can I order products in customized sizes and colors?

Of course. We welcome custom sizes and colors to meet different storage, retail display and project requirements.

06 Do you manufacture shelving and displays using different materials?

Yes. Our products are mainly manufactured from metal. We also produce shelving accessories and display solutions using materials such as:

  • Wood
  • Titanium alloy
  • Acrylic
  • Glass
  • Other materials according to project requirements
07 What is your production and delivery lead time?

Our general production lead time is within 15 days. The actual lead time depends on the order quantity, product design and customization requirements.

08 What are your payment terms?

Our standard payment terms are:

  • 30% deposit upon confirmation and signing of the Proforma Invoice (PI).
  • 70% balance paid by T/T before delivery.
09 How can my order be shipped?

We can arrange shipment using the following methods:

Option 1 — Sea Freight

Please provide your destination seaport. We will check and update the sea freight cost based on your shipping destination.

Option 2 — Customer-Nominated Shipping Agent

If you have your own shipping agent or freight forwarder, please provide their contact details. We will coordinate the delivery arrangements with your nominated agent.

10 What is your minimum order quantity (MOQ)?

Our minimum order quantity is generally 10 sets. Larger order quantities may qualify for more competitive pricing.

11 How can I get a quick and accurate quotation?

Since different customers and projects require different product sizes and specifications, providing the following information will help us prepare your quotation more efficiently.

For Warehouse Storage Racking

  1. Products to be stored: Tell us what items you plan to store.
  2. Storage method: Specify whether your products will be stored in cartons or on pallets.
  3. Weight and dimensions: Provide the unit weight and dimensions (Length × Width × Height) of each carton or pallet.
  4. Storage configuration: Tell us how many cartons or pallets you need per level and how many storage levels are required.
  5. Available space: Provide the dimensions of your storage area. A warehouse floor plan is especially helpful.
  6. Accessories: Specify any required wire decking, metal decking, wooden decking, safety bars, shims or other accessories.

For Supermarket & Retail Display Shelving

  1. Store layout: Provide the size of your retail space or a store floor plan.
  2. Products to display: Tell us what merchandise you plan to display and the required loading capacity.
  3. Preferred shelving style: Specify your requirements for metal or wood construction, dimensions, colors and design.

Not sure about the specifications? Simply tell us about your storage or display requirements. Our experienced sales team will help you develop a suitable shelving solution.

12 How do I install the shelving or racking system?

We provide step-by-step installation drawings for each type of shelving and racking system.

Our experienced team supports customers throughout the design, production and after-sales stages.

13 How are your products packed for shipment?

Our shelving products are generally flat-packed and protected with bubble wrap or protective film, using standard export cartons.

Other packaging options, such as wooden boxes, are also available according to customer requirements.

14 What is the difference between a starter rack and an add-on rack?

The main difference is the number of upright frames required.

  • Starter Rack (Main Rack): The first shelving unit in a row, supplied with two upright frames.
  • Add-On Rack: An extension unit that uses one additional upright frame and connects to the preceding rack.

Example: For a continuous row of 15 wall shelving bays, the configuration would be 1 starter rack + 14 add-on racks.

We use Cookies to improve your browsing experience. By continuing to use this website, you agree to our use of Cookie.